Built a 12x16 shed in my backyard in Tulsa last month and it took 9 days instead of the 3 I planned
Day 4 is when I found out my concrete slab was 2 inches out of level on one corner, so I had to rent a grinder from the Home Depot on 71st and lose a whole weekend fixing it, has anyone else had a slab pour go sideways on them and how did you deal with it the second time?