Ngl, I messed up a pour last week on a patio in Phoenix by not wetting the base enough before dumping. The concrete dried too fast and I spent like 4 extra hours grinding down ridges and patching low spots with slurry. Honestly should have just mixed in some retarder upfront or waited for cooler temps. Has anyone else had a simple job blow up because of a dumb prep mistake like that?