Saw a job shop outside Dayton running two lathes off one bar feeder and I can't stop thinking about it
Stopped by a shop in Miamisburg last Thursday to pick up some tooling and they had one bar feeder feeding two lathes with a quick swap setup. The owner said it cut his load time by about 40 minutes a shift, but I'm wondering if the setup headache is worth it on anything short of a big run. Anyone here run a shared feeder setup and regret it?
Wow, that's wild. It reminds me of how people double up washer and dryer loads or split one garden hose between two sprinklers. You save a little time here and there, but the moment something needs to switch over, everything backs up. In my experience, shared setups like that only pay off when the two things running are close enough in cycle time that neither one sits waiting. If one lathe finishes early every time, you didn't save 40 minutes, you just moved the wait somewhere else. Did he mention what happens when one job needs a different bar size mid-shift?