PSA: swapping my roughing end mill for a 3 flute at 1500 rpm cut my chatter but doubled my cycle time
I was running a batch of 6061 brackets on my Haas VF2 last Thursday and getting that awful ringing chatter in the pocket corners, so I switched from my usual 4 flute roughing mill to a 3 flute aluminum hogger and dropped the spindle to 1500 rpm. The finish came out way smoother and I stopped breaking inserts every 20 parts, but my cycle time on each bracket jumped from about 4 minutes to almost 8, which means I lost money on the run even with the tooling savings. What surprised me was that the chatter was really coming from my workholding, not the cutter, because when I switched back to the 4 flute at the same low rpm the noise came right back, so the 3 flute was just masking a loose fixture instead of fixing the actual problem. I checked my vises and found one jaw was about 0.010 out of parallel, and once I shimmed it the original tool ran clean at 3000 rpm with no chatter at all. Lesson for me is to check the setup before I start blaming the tool, because chasing the cutter cost me nearly two days of production on 60 parts. I went back to the 4 flute and got the cycle time down to 3 minutes flat after dialing in the vise. Has anyone else had a tool change hide a fixture issue like that, or am I the only one who wasted a whole shift on the wrong fix?