My old foreman said something about mixing mortar by feel that stuck with me after 18 years
Ran into my first foreman, Ray, at a supply yard in Dayton last month and he asked if guys still check their mud by hand or just go off the bucket directions. I told him most of the younger crew I run with follow the bag ratios to the letter, and he laughed and said back in '98 they'd test a batch by how it slid off the hoe. That hit me because I've been doing it his way for so long I forgot it wasn't written anywhere. Now I'm wondering if I should be teaching the feel method to the new guys or just sticking to the jug. How do you all train greenhorns on mortar consistency, by the book or by touch?