DAE remember hand rolling tube sheets with a ratchet strap and a prayer?
Back when I was coming up in the trade at the Gary works, we'd roll a tube sheet by hand with a chain fall and a ratchet strap because the shop wouldn't spring for a torque wrench, and it took two guys most of a shift. Now every job I'm on has a hydraulic roller with a gauge on it, and a green helper can punch a sheet in about 40 minutes flat. Did your shop ever make the switch, or are some of you still out there doing it the old way because the boss says the new rig 'costs too much'?