Why does nobody talk about how the permit office on Piedmont went from 3 weeks to 2 days
I had to pull a kitchen remodel permit back in 2019 and it took almost a month, three trips to the counter on Piedmont, and one very grumpy guy telling me my site plan was drawn wrong. Fast forward to last month, same kind of job, and I had the thing approved in about 48 hours without ever leaving my truck. The online portal is the big change, you upload the drawings, pay the fee, and they actually send notes back the same day instead of making you drive down there. I stood in that lobby for maybe 20 minutes this time and it was half empty, which felt weird after years of it being packed with contractors. My guy at the lumber yard said the city added a bunch of reviewers and started doing virtual inspections around 2021, and I guess it stuck. What I want to know is if the smaller cities around here (Sandy Springs, Decatur, Marietta) have caught up too, or is it still paper and phone tag over there?