Hot take: one-man installs vs. two-man crews for a basic panel swap
Ran into a guy at the supply house on Route 9 in Jersey last week who said he won't touch a panel swap alone anymore, and I've been chewing on it since. His reason was simple: who holds the light and reads the meter when you're up on the ladder? I've done dozens of basic 20-zone swaps solo and honestly the speed is way better, no waiting on somebody to finish their smoke break. But then I think about the one time a keypad harness bit me in a crawlspace and I spent 20 minutes flat on my back, and a second set of hands would've saved me the grief. Two-man crews cost more per hour but they finish the walkthrough and the zone test in one trip instead of two. So which is it, do you eat the labor and run pairs, or do you fly solo and just get real careful about your harness routing? Tell me what actually works for you on a plain residential panel job.